| Unified Command Photo Gallery |
 |
 |
|
|
| Princess Kathleen grounded at Lena Point, September 7, 1952 |
Princess Kathleen grounded at Lena Point, September 7, 1952 |
|
|
 |
 |
 |
|
| Contractors conduct assessment of vessel using remotely operated vehicle, February 18, 2010. |
Contractors conduct assessment of vessel using remotely operated vehicle, February 18, 2010. |
Contractors conduct assessment of vessel using remotely operated vehicle, February 18, 2010. |
|
 |
 |
 |
 |
| Captain Bert speaks with local television media during the public open house on March 4, 2010. |
Commander Jones looks at dive equipment which will be used during Phase II assessment on the Princess Kathleen. The Phase II assessment seeks to determine the condition of the Princess Kathleen hull and fuel tanks and determine the quantity of fuel still onboard the vessel. |
State On Scene Coordinator Scot Tiernan (right) shows the original plans for the Princess Kathleen during the public open house on March 4, 2010. |
Spill response equipment on display during the open house on March 4, 2010. |
 |
|
|
|
| Visitors view a PowerPoint on the history of the Princess Kathleen during the March 4 open house. The PowerPoint can be view here (link). |
|
|
|
 |
 |
 |
 |
| Dive assessment, 3/11/2010 |
|
|
|
 |
 |
|
|
| Dive assessment operations, 3/15/2010 |
 |
 |
 |
 |
| Dive assessment operations, 3/16/2010 |
 |
 |
 |
 |
| Photos taken by local diver Annette G.E. Smith. NOTE: these photos do not reflect the vessel's current condition. |
 |
 |
|
|
| Photos taken during the media availability March 18. |
 |
 |
 |
 |
| March 26-27 dive operations. |
| Open House, Apri1 1, 2010 |
|
|
|
 |
 |
 |
 |
 |
 |
|
|
| Apri1 20, 2010 |
|
|
|
 |
 |
|
|
| May 10, 2010 |
|
|
|
 |
 |
|
|
|